Passage Prep - Headed South

Nov 1

Agenda Set. Time to Prepare.

Our goal is to be in the Bahamas by mid-January. The tentative schedule has us leaving Urbanna right after Oyster Fest, heading to Hilton Head Island to visit Ken’s parents, then on to Jekyll Island GA, one of Georgia’s Sea Islands, and then to Ft Lauderdale. We will leave Bistari in Ft Lauderdale for three weeks while we spend Christmas with the family and Bistari gets new rigging.

Prior to leaving we have a check list of boat projects to complete.

Check List

  • Clean hull

  • Order new power cable

  • Fix old power cable for backup

  • Change engine, transmission and generator oil

  • Change fuel filters

  • Change impeller

  • Wax hull

  • Replace outboard fuel line

  • Adjusted whisker pole traveler

  • Replace oar bracket on Patience (dingy)

  • Greased the furlex furlers

  • Quotes for rigging refit

  • Quotes for bimini and dodger replacement

  • Select fabric for bimini and dodger

  • Download Bahama maps to Navionics

  • Shopping List

  • Prepare passage meals for frig and freeze

  • Defrost refrigerator and freezer

  • Clean bottom of boat



 
 
Previous
Previous

Jekyll Island

Next
Next

Game Changer